A luxurious casita for fun We are very proud of the finished project, a casita that’s 1500 square feet of Luxury. All aspects of the project stayed true to the designer’s and owner’s vision. On a Previous Post, we posted some pictures of the start of project as well as what the lot looked like. […]
Clean and Organized Job-sites
Keeping a Job-site clean and organized can be a challenge for any construction crew. During a construction project, there are many subcontractors completing tasks and clean up tends to be the last thing on their mind. So, who is responsible for maintaining a job site clean? Typically, it is up to each subcontractor to pick […]
Newest Remodel Completed
We completed this Remodel at a high rise earlier this year. It was a residence where most of the existing unit was gutted and where panels or wall stayed, they were painted over. As is typical with these Remodels most of the high end work happens in Kitchens and Bathrooms. Credit of course goes to […]
Two Fireplaces
Two Fireplaces in one Home This project called for Two Fireplaces in one home to be transformed from average to Amazing with the addition of slabs. Many brand new homes are sold with bare white walls. Most of the upgrades happen around kitchen and bathrooms with the addition of stone counters, backsplashes, “fancy” tile in […]
New Kitchen at Spring Valley Home
Before The new kitchen at this home was a traditional country style complete with a brick fireplace which also fed into the living room on an opposite wall. The kitchen was separated by a wall with a small window that allowed for passing of food or other items into the dining room, flooring was different in both […]